info@marineresults.com   |   +44 2380 454666 Hamble, UK   |   +34 971 57 01 33 Palma de Mallorca   |   Contact Us

Stepping the masts of Black Pearl.

We’re delighted to have been involved in such an exciting project. 105 metres with 3 DynaRig masts. Watch from 4mins 30seconds in to see Marine Results doing their stuff. Great work team!