info@marineresults.com   |   +44 2380 454666 Hamble, UK   |   +34 971 57 01 33 Palma de Mallorca   |   Contact Us

Mast makeover for Borkumriff IV

The Marine Results Palma team stepped the fore and main masts of the beautiful classic schooner Borkumriff IV at STP Palma this summer. This 50.58m Royal Huisman build underwent a full rig service on the dockside at STP. Her two masts were unstepped and surveyed before modifications were made to allow the installation of new Harken switch gate tracks, after which the masts were re-stepped. The fittings were serviced in our Palma workshop and all high load fittings were tested using florescent water washable dye penetrant inspection methods.